Recent Changes

Wednesday, May 22

  1. page SOLID MODELING edited exploded view of centering rod Week of 4/29/13 - Based on who is done with their competition …
    exploded view of centering rod
    Week of 4/29/13 - Based on who is done with their competition drawings I will put you in groups of two to work on drawing 14.90 as a team. You will decide how it will be done with a due date of 5/17/13 for all drawings and animations. Make sure to apply materials to all parts.
    Week of 4/8/13 - You should be working on a competition assembly from Chapter 14. The description of the categories that you have to choose 3 of are found in my TS$ folder under MITES Categories. You can also find examples posted around the CNC machine. These are due by 4/26 and will NOT be accepted after that date as there is a due date for the day they must be entered by. The due date can be moved up if I see alot of people sitting around and not working.
    (view changes)
    5:17 am
  2. page SOLID MODELING edited <object width="560" height="315"><param name="movie" value=…
    <object width="560" height="315"><param name="movie" value="https://www.youtube.com/v/LA6y5RX_zqk?version=3&amp;hl=en_US"></param><param name="allowFullScreen" value="true"></param><param name="allowscriptaccess" value="always"></param><embed src="https://www.youtube.com/v/LA6y5RX_zqk?version=3&amp;hl=en_US" type="application/x-shockwave-flash" width="560" height="315" allowscriptaccess="always" allowfullscreen="true"></embed></object>exploded view of centering rod
    Week of 4/29/13 - Based on who is done with their competition drawings I will put you in groups of two to work on drawing 14.90 as a team. You will decide how it will be done with a due date of 5/17/13 for all drawings and animations. Make sure to apply materials to all parts.
    Week of 4/8/13 - You should be working on a competition assembly from Chapter 14. The description of the categories that you have to choose 3 of are found in my TS$ folder under MITES Categories. You can also find examples posted around the CNC machine. These are due by 4/26 and will NOT be accepted after that date as there is a due date for the day they must be entered by. The due date can be moved up if I see alot of people sitting around and not working.
    (view changes)
    5:15 am
  3. page SOLID MODELING edited <object width="560" height="315"><param name="movie" value=…
    <object width="560" height="315"><param name="movie" value="https://www.youtube.com/v/LA6y5RX_zqk?version=3&amp;hl=en_US"></param><param name="allowFullScreen" value="true"></param><param name="allowscriptaccess" value="always"></param><embed src="https://www.youtube.com/v/LA6y5RX_zqk?version=3&amp;hl=en_US" type="application/x-shockwave-flash" width="560" height="315" allowscriptaccess="always" allowfullscreen="true"></embed></object>
    Week of 4/29/13 - Based on who is done with their competition drawings I will put you in groups of two to work on drawing 14.90 as a team. You will decide how it will be done with a due date of 5/17/13 for all drawings and animations. Make sure to apply materials to all parts.
    Week of 4/8/13 - You should be working on a competition assembly from Chapter 14. The description of the categories that you have to choose 3 of are found in my TS$ folder under MITES Categories. You can also find examples posted around the CNC machine. These are due by 4/26 and will NOT be accepted after that date as there is a due date for the day they must be entered by. The due date can be moved up if I see alot of people sitting around and not working.
    (view changes)
    5:14 am

Thursday, May 16

  1. page Advanced Architectural CADD edited Week of 5/13/13 - What to turn in for your hotel drawings. - Floor plans with dimensions and l…

    Week of 5/13/13 - What to turn in for your hotel drawings. -
    Floor plans with dimensions and labels of rooms
    Elevations n/s/e/w
    Camera view rendering of front and rear elevations

    Week of 4/29/13 - Work on your poster board of your realistic views for the MD-10 category. Once you have finished your MITES categories you will be drawing your hotel. Read the attached document for the details of what is expected to be found in the hotel.
    {HOTEL DRAWING.docx}
    (view changes)
    4:53 am

Wednesday, May 15

  1. page CADD 3B edited Week of 4/29/13 - You are going to start auxiliary drawings. Use the link below for the list of d…

    Week of 4/29/13 - You are going to start auxiliary drawings. Use the link below for the list of drawings expected. You will draw the parts as usual and place 4 views on the titleblock - top, front, side and auxiliary -this is the true size and shape of the angled/sloped surface. Some dimensions will be placed on these views.
    {AUXILIARY VIEWS.docx}VIEWS (1).docx}
    Week of 4/8/13 - You will continue working on your competition drawings - you must enter 3 categories. You can find the descriptions of the categories in my TS$ folder in the MITES Categories folder. There are also examples of some of the categories taped to the CNC machine cage. You have until 4/26 to have them done if we finish earlier we will move on! I will NOT accept these drawings after 4/26 as the competition has a due date and are not accepted after then. You may choose your part from Chapters 6, 7 or 14. You will be drawing single parts and make sure to get my approval before you begin drawing it.
    Week of 3/18/13 - Continue working on the sectional problems listed on the link below when you are finished with the list you will choose parts of your own that you will enter into the state competition. Your choice must be approved by me. If you are completed with all sectionals go to my teacher share folder and look at the Mites Categories folder and the Mechanical Categories to see the descriptions of the categories you will be choosing from. Yes you will be entering 3 categories.
    (view changes)
    6:47 am

Tuesday, May 14

  1. page Architectural CADD edited Week of 5/13/13 - What you will need to show for your grade on the remodel.... Floor plan label…

    Week of 5/13/13 - What you will need to show for your grade on the remodel....
    Floor plan labeled with dimensions - printed out 11x17
    Make a walk through in realistic and show to me when finished for me to grade that portion
    2-4 renderings of your space on a titleblock

    Week of 4/29/13 - Once you have finished your projects for MITES you are going to either choose to redesign the school library or cafeteria. Use the link below to see the details of the project.
    {REDESIGN PROJECT.docx}
    (view changes)
    6:07 am

Tuesday, May 7

  1. page home edited ... Surface Modeling Independent Study CEDAR POINT - 5/15/13 - The cost is $58/person that is y…
    ...
    Surface Modeling
    Independent Study
    CEDAR POINT - 5/15/13 - The cost is $58/person that is your ticket to Cedar Point and for the motor coach bus. You will pay by cash or check to the book store by April 26th either during your time with me or on your lunch time. Bring the receipt to me so that your spot can be reserved. We must have 50 people sign up by April 26th or the trip is cancelled. If the trip is cancelled your money will be refunded to you through the board office writing you a check. It is first come first serve and seniors don't forget prom is 2 days after the trip.
    Do Now for 2/22/13 - You are going to go the the website link below once there you will click on "start new game," leave the timer on and the increment level should be set to Sixteenths. You will try until you get 3 strikes and then you will alert me so that I can look at your score and level you got.
    The Ruler Game
    (view changes)
    11:26 am

Monday, April 29

  1. page INDEPENDENT STUDY edited Week of 4/29/13 - You will have until Wednesday at the end of the hour to bring me what you are go…
    Week of 4/29/13 - You will have until Wednesday at the end of the hour to bring me what you are going to be drawing. - This is INDEPENDENT study so you have to pick. You do not want what is waiting if you do not give me the idea and examples by this Wednesday.
    Wednesday 1/30/13 - By the end of the hour today I want to know what your first drawing is going to be. Look in Chapter 6 for a challenging problem of your choice, then get my approval. By the end of the hour today I want to know what it is you are doing.
    Tuesday 1/29/13 - Social Contract
    (view changes)
    2:11 pm

More